Quick answer
When Attached fails, troubleshoot in order: file/format, permission/lock, output settings, another tool. Attached ADU depends on area/structure/connection/permits.
Why it matters
Start with the most common and cheapest causes to narrow it down fast.
Area.
Step by step
- Check type/lot/zoning/permits/utilities/structure.
- Separate design/permits/foundation/build/utilities/finishes.
- Get 2-3 quotes; confirm scope/permits/timeline.
- Contract states scope/changes/payment/warranty.
Common mistakes
- Per-square-foot only, not permits/utilities.
- Ignoring zoning/lot/parking.
- Not checking structure/foundation.
- No change/timeline terms.
Checklist
- Type/lot/zoning/permits/utilities.
- Design/foundation/build/finishes.
- Structure/parking/privacy/fire.
- Contract/changes/payment/warranty.
- Budget/financing/ROI.
Key facts
- Area.
- Structure.
- Connection.
FAQ
How do I troubleshoot a failed Attached task?
When Attached fails, troubleshoot in order: file/format, permission/lock, output settings, another tool. Attached ADU depends on area/structure/connection/permits.
How long does it take?
Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.
Is data uploaded?
Runs locally and does not upload video/audio; extensions may still read the page.
Source: AARP