Home/Answers/Prefab
ADU COST LAB / Prefab

Before Prefab Processing

Before Prefab, back up the original, confirm format/size/quality requirements and close programs that lock the file.

Updated 2026-11-02About 3 minLocal test
Quick answer

Before Prefab, back up the original, confirm format/size/quality requirements and close programs that lock the file. Prefab ADU depends on size/delivery/foundation/install.

Why it matters

Poor preparation leads to overwrites, failures and rework.

Size.

Step by step

  1. Check type/lot/zoning/permits/utilities/structure.
  2. Separate design/permits/foundation/build/utilities/finishes.
  3. Get 2-3 quotes; confirm scope/permits/timeline.
  4. Contract states scope/changes/payment/warranty.

Common mistakes

  • Per-square-foot only, not permits/utilities.
  • Ignoring zoning/lot/parking.
  • Not checking structure/foundation.
  • No change/timeline terms.

Checklist

  • Type/lot/zoning/permits/utilities.
  • Design/foundation/build/finishes.
  • Structure/parking/privacy/fire.
  • Contract/changes/payment/warranty.
  • Budget/financing/ROI.

Key facts

  • Size.
  • Delivery.
  • Foundation.

FAQ

How should I prepare before Prefab?

Before Prefab, back up the original, confirm format/size/quality requirements and close programs that lock the file. Prefab ADU depends on size/delivery/foundation/install.

How long does it take?

Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.

Is data uploaded?

Runs locally and does not upload video/audio; extensions may still read the page.

Source: HUD