Home/Answers/Cost factors
ADU COST LAB / Cost factors

After Cost factors Processing

After Cost factors, spot-check the output, then decide whether to delete/archive the original; keep a backup.

Updated 2026-11-02About 3 minLocal test
Quick answer

After Cost factors, spot-check the output, then decide whether to delete/archive the original; keep a backup. Type/area/permits/utilities/finishes drive total.

Why it matters

A backup lets you roll back if the output is wrong.

Type.

Step by step

  1. Check type/lot/zoning/permits/utilities/structure.
  2. Separate design/permits/foundation/build/utilities/finishes.
  3. Get 2-3 quotes; confirm scope/permits/timeline.
  4. Contract states scope/changes/payment/warranty.

Common mistakes

  • Per-square-foot only, not permits/utilities.
  • Ignoring zoning/lot/parking.
  • Not checking structure/foundation.
  • No change/timeline terms.

Checklist

  • Type/lot/zoning/permits/utilities.
  • Design/foundation/build/finishes.
  • Structure/parking/privacy/fire.
  • Contract/changes/payment/warranty.
  • Budget/financing/ROI.

Key facts

  • Type.
  • Area.
  • Permits.

FAQ

What should I do after Cost factors?

After Cost factors, spot-check the output, then decide whether to delete/archive the original; keep a backup. Type/area/permits/utilities/finishes drive total.

How long does it take?

Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.

Is data uploaded?

Runs locally and does not upload video/audio; extensions may still read the page.

Source: AARP